सामग्री पर जाएँ
High-Density Orchards · Kashmir Call us: 9622843572
सेवाएँ

Everything between the bare field and the first harvest.

Plants, trellis, drip irrigation and anti-hail net — designed, supplied and installed by one team.

Apple Plants & Rootstocks.

Feathered 2-year knip trees on dwarfing M9 and semi-dwarfing MM106 rootstocks, certified virus-free and altitude-matched.

  • M9 T337 & MM106 certified rootstocks
  • 2-year feathered trees with 5+ branches
  • Gala, Red Delicious clones, Granny Smith & Fuji
  • Dormant winter delivery (Dec – March)

Trellis Work.

Prestressed concrete and zinc-galvanized posts with 4 tiers of high-tensile wire, anchored end assemblies and tree clips.

  • 3.6 m prestressed concrete / zinc-galvanized posts
  • 2.5 mm high-tensile wire with wire tighteners
  • Heavy-duty screw earth anchors per row end
  • Bamboo stakes so every tree grows straight

Drip Irrigation.

Automated pressure-compensating inline drip laterals sized for your soil and water source, with fertigation injection.

  • 16 mm pressure-compensating inline dripline
  • Screen / disc filtration and main line
  • Venturi injector for targeted fertigation
  • Even water distribution across all elevations

Anti-Hail Net.

Poles on a 10 m grid, perimeter cable and UV-stabilised crystal net over the whole plantable area to safeguard your crop.

  • 4.5 m poles, perimeter cable and turnbuckles
  • High-density UV-treated polyethylene net
  • Net clips every 2 m² with elastic cords
  • Opened and closed each season on request

Complete Grower Package.

One team, one contract, one warranty. From GPS soil and boundary survey to planting, trellis, drip and net installation.

  • Single point of responsibility across all phases
  • Transparent itemized Bill of Materials with GST bills
  • Experienced in-house crews and machinery
  • First-year survival guarantee & warranty support

Orchard Planning & GIS Mapping.

Accurate GPS boundary survey, elevation analysis, optimal north-south row alignment and pollinizer layout design.

  • Walked GPS boundary and contour mapping
  • Row orientation for maximum sunlight exposure
  • Variety distribution & 11% pollinizer ratio
  • Full CAD/GIS layout sheet with pole distances
यह कैसे काम करता है

एक फ़ोन कॉल से पहली फसल तक सात चरण।

  1. 1
    कॉल करें या अपना विवरण भेजें.

    Tell us your village and roughly how many kanal you want to plant. We call back within a working day.

  2. 2
    फ़ार्म विज़िट.

    An inspector walks the boundary with GPS, checks water, slope and access, and photographs the plot.

  3. 3
    डिज़ाइन और कोटेशन.

    Rows, posts, wire, drip and net are laid out on your actual plot; you get a link with the map, the quantities and the price.

  4. 4
    पुष्टि.

    Approve the quotation, pay the advance by UPI or bank transfer, and we book your material and crew.

  5. 5
    सामग्री की रवानगी.

    Posts, wire, pipe and net arrive with a delivery challan; you can see every item against the design.

  6. 6
    इंस्टॉलेशन.

    Our crew installs the trellis, drip and net and plants the trees, with daily progress photos.

  7. 7
    हैंडओवर और बिक्री के बाद सेवा.

    A joint checklist and warranty on the structure. Tears, leaks or mortality — one call and we come.

सामान्य प्रश्न

बागवानों के सवाल।

एक कनाल में कितने पौधे लगते हैं?

At 3 m × 1 m spacing a kanal (505 m²) takes about 150–165 plants after headlands; the estimator shows the exact count for your area and template.

पौधे लगाने का मौसम कब है?

Bare-root plants go in from late November to March while the trees are dormant. Trellis, drip and net can be installed any time the ground is workable, so we book sites for structure work through summer and autumn.

क्या आप पौधे भी देते हैं?

Yes — feathered trees on M9 and MM106 rootstock from our nursery partners, with variety and rootstock written on the quotation. You can also bring your own plants and we install the rest.

एंटी-हेल नेट की प्रति कनाल लागत क्या है?

It depends on pole spacing and the net grade; the estimator prices the net separately so you can see the orchard with and without it.

इंस्टॉलेशन में कितना समय लगता है?

A 10-kanal site is usually trellised and dripped in 10–14 working days once material is on site; plants take two more days. Net installation follows in a separate pass.

क्या सब्सिडी की कागज़ी कार्रवाई शामिल है?

We prepare the design, quotation and GST invoices that departmental schemes ask for, and tell you what to file; the application itself stays with you.

लगाने के लिए तैयार हैं? मुफ़्त फ़ार्म विज़िट से शुरू करें।

अपना गाँव और कनाल बताएँ। हम एक कार्यदिवस में वापस कॉल करके इंस्पेक्टर की विज़िट तय करेंगे।