Skip to content
High-Density Orchards · Kashmir Call us: 9622843572
Services

Everything between the bare field and the first harvest.

Plants, trellis, drip irrigation and anti-hail net — designed, supplied and installed by one team.

Apple Plants & Rootstocks.

Feathered 2-year knip trees on dwarfing M9 and semi-dwarfing MM106 rootstocks, certified virus-free and altitude-matched.

  • M9 T337 & MM106 certified rootstocks
  • 2-year feathered trees with 5+ branches
  • Gala, Red Delicious clones, Granny Smith & Fuji
  • Dormant winter delivery (Dec – March)

Trellis Work.

Prestressed concrete and zinc-galvanized posts with 4 tiers of high-tensile wire, anchored end assemblies and tree clips.

  • 3.6 m prestressed concrete / zinc-galvanized posts
  • 2.5 mm high-tensile wire with wire tighteners
  • Heavy-duty screw earth anchors per row end
  • Bamboo stakes so every tree grows straight

Drip Irrigation.

Automated pressure-compensating inline drip laterals sized for your soil and water source, with fertigation injection.

  • 16 mm pressure-compensating inline dripline
  • Screen / disc filtration and main line
  • Venturi injector for targeted fertigation
  • Even water distribution across all elevations

Anti-Hail Net.

Poles on a 10 m grid, perimeter cable and UV-stabilised crystal net over the whole plantable area to safeguard your crop.

  • 4.5 m poles, perimeter cable and turnbuckles
  • High-density UV-treated polyethylene net
  • Net clips every 2 m² with elastic cords
  • Opened and closed each season on request

Complete Grower Package.

One team, one contract, one warranty. From GPS soil and boundary survey to planting, trellis, drip and net installation.

  • Single point of responsibility across all phases
  • Transparent itemized Bill of Materials with GST bills
  • Experienced in-house crews and machinery
  • First-year survival guarantee & warranty support

Orchard Planning & GIS Mapping.

Accurate GPS boundary survey, elevation analysis, optimal north-south row alignment and pollinizer layout design.

  • Walked GPS boundary and contour mapping
  • Row orientation for maximum sunlight exposure
  • Variety distribution & 11% pollinizer ratio
  • Full CAD/GIS layout sheet with pole distances
How it works

Seven steps from a phone call to the first harvest.

  1. 1
    Call or send your details.

    Tell us your village and roughly how many kanal you want to plant. We call back within a working day.

  2. 2
    Farm visit.

    An inspector walks the boundary with GPS, checks water, slope and access, and photographs the plot.

  3. 3
    Design & quotation.

    Rows, posts, wire, drip and net are laid out on your actual plot; you get a link with the map, the quantities and the price.

  4. 4
    Confirm.

    Approve the quotation, pay the advance by UPI or bank transfer, and we book your material and crew.

  5. 5
    Material dispatch.

    Posts, wire, pipe and net arrive with a delivery challan; you can see every item against the design.

  6. 6
    Installation.

    Our crew installs the trellis, drip and net and plants the trees, with daily progress photos.

  7. 7
    Handover & after-sales.

    A joint checklist and warranty on the structure. Tears, leaks or mortality — one call and we come.

FAQ

Questions growers ask.

How many plants fit in one kanal?

At 3 m × 1 m spacing a kanal (505 m²) takes about 150–165 plants after headlands; the estimator shows the exact count for your area and template.

When is the planting season?

Bare-root plants go in from late November to March while the trees are dormant. Trellis, drip and net can be installed any time the ground is workable, so we book sites for structure work through summer and autumn.

Do you supply the plants too?

Yes — feathered trees on M9 and MM106 rootstock from our nursery partners, with variety and rootstock written on the quotation. You can also bring your own plants and we install the rest.

What does the anti-hail net cost per kanal?

It depends on pole spacing and the net grade; the estimator prices the net separately so you can see the orchard with and without it.

How long does installation take?

A 10-kanal site is usually trellised and dripped in 10–14 working days once material is on site; plants take two more days. Net installation follows in a separate pass.

Is subsidy paperwork included?

We prepare the design, quotation and GST invoices that departmental schemes ask for, and tell you what to file; the application itself stays with you.

Ready to plant? Start with a free farm visit.

Tell us your village and how many kanal. We call back within a working day and book the inspector.